4th Picture Set Not much change in the exterior since the last set of photos.
The detached garage is coming along.
The special concrete floor has been poured. It is 7" thick to accommodate a hydraulic lift if I ever decide to install one.
We were scheduled to be away when they poured the floor so we had them make an impression in some scrap concrete and the workers put it into the floor when they poured it.
Bathrooms are coming along nicely. This is the "guest room" bath.
This is the boys bath, the small tiles are 3D relief of insects (frog, lizard and mosquito)
Here's our shower and tub in the master bath.
The basement has drywall now.
One nice feature is the 10' wide walkout stairway for the basement.
|